Project MISO-J1882 — Project Summary

Queue ID
MISO-J1882
Capacity
45 MW
Technology
Battery
Status
active
Location
Tazewell, IL
Region
MISO
Developer
IA Status
Cluster Study

MISO-J1882

MISO-J1882BetaActiveBatteryMISOLBNL + Live

45 MW storage in Tazewell, IL · In queue since March 2022 · Proposed COD September 2024

45 MW

Capacity

1

Components

Battery

4y 2m

In Queue

Cluster Study

IA Status

COD target: 2024

Interconnection

Total Duration

2y 6m

Schedule

20 months past proposed COD

Impact Study25%
Queue EntryMar 28, 2022

Interconnection request submitted to ISO/RTO

DPP StudyCurrent

MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.

Typical: 30–40 months (historical); 12 months target

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2024-09-15

About

MISO-J1882 is a proposed 45 MW battery storage project located in Tazewell County, Illinois. The project is in the Midcontinent Independent System Operator (MISO) interconnection queue, having entered the queue on March 28, 2022. The proposed commercial operation date is September 15, 2024. Ameren Illinois is the utility associated with the point of interconnection, named San Jose Rail 138kV. The project's interconnection status is currently in the Cluster Study phase.

The development project consists solely of battery storage, with a total capacity of 45 MW. The entity responsible for the project within the MISO queue is MISO itself. The project is listed as active within the interconnection queue.

Generated from interconnection queue and public data sources

Project Details

State

IL

County

Tazewell

Grid Region

MISO (Midcontinent)

Market

ISO/RTO Member

Developer

Utility

AMEREN ILLINOIS

Entity

MISO

Service Type

Point of Interconnection

San Jose Rail 138kV

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
MISO
Trading Hub
ILLINOIS.HUB
Hub Confidence
MEDIUM

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Project MISO-J1882