MISO-J1916
100 MW generation in Branch, MI · In queue since October 2023 · Proposed COD November 2023
100 MW
Capacity
1
Components
Solar
2y 7m
In Queue
Cluster Study
IA Status
COD target: 2023
Total Duration
1 month
Schedule
30 months past proposed COD
Interconnection request submitted to ISO/RTO
MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.
Typical: 30–40 months (historical); 12 months target
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2023-11-01
MISO-J1916 is a proposed 100 MW solar generation project located in Branch County, Michigan. The project, interconnected within the Midcontinent Independent System Operator (MISO) region, entered the MISO queue on October 19, 2023, with a proposed commercial operation date of November 1, 2023. The project's interconnection status is currently in the Cluster Study phase.
The proposed project is to be connected to the Newton 138 kV substation. The queue entry lists the utility as METC and the entity as MISO.
Generated from interconnection queue and public data sources
State
MI
County
Branch
Grid Region
MISO (Midcontinent)
Market
ISO/RTO Member
Developer
—
Utility
METC
Entity
MISO
Service Type
—
Point of Interconnection
Newton 138 kV substation
Data Source
LBNL + Live
- ISO / RTO
- MISO
- Trading Hub
- MICHIGAN.HUB
- Hub Confidence
- HIGH
- POI Substation
- Newton Eighth Street Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project MISO-J1916