MISO-J1926
200 MW generation in Tazewell, IL · In queue since March 2022 · Proposed COD October 2025
200 MW
Capacity
1
Components
Wind
4y 2m
In Queue
Cluster Study
IA Status
COD target: 2025
Total Duration
3y 7m
Schedule
7 months past proposed COD
Interconnection request submitted to ISO/RTO
MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.
Typical: 30–40 months (historical); 12 months target
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2025-10-01
MISO-J1926 is a proposed 200 MW wind generation project located in Tazewell County, Illinois. The project is interconnected within the Midcontinent Independent System Operator (MISO) region, with Ameren Illinois as the utility. The project entered the MISO interconnection queue on March 23, 2022, and has a proposed commercial operation date of October 1, 2025. Its interconnection status is currently in the Cluster Study phase.
The point of interconnection (POI) for the project is the Huff - Towerline 138kV line. The project consists of 200 MW of wind generation capacity.
Generated from interconnection queue and public data sources
State
IL
County
Tazewell
Grid Region
MISO (Midcontinent)
Market
ISO/RTO Member
Developer
—
Utility
AMEREN ILLINOIS
Entity
MISO
Service Type
—
Point of Interconnection
Huff - Towerline 138kV
Data Source
LBNL + Live
- ISO / RTO
- MISO
- Trading Hub
- ILLINOIS.HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project MISO-J1926