MISO-J1927
23.4 MW generation in Muscatine, IA · In queue since December 2021 · Proposed COD July 2024
23.4 MW
Capacity
1
Components
Solar
4y 5m
In Queue
In Progress (unknown study)
IA Status
COD target: 2024
Total Duration
2y 7m
Schedule
22 months past proposed COD
Interconnection request submitted to ISO/RTO
MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.
Typical: 30–40 months (historical); 12 months target
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2024-07-15
MISO-J1927 is a proposed solar generation project with a total capacity of 23.4 MW, located in Muscatine County, Iowa. The project is in the Midcontinent Independent System Operator (MISO) interconnection queue, with an entry date of December 3, 2021, and a proposed commercial operation date of July 15, 2024. The designated point of interconnection (POI) is the Grandview Substation at 69 kV. Muscatine Power and Water is listed as the utility.
The interconnection agreement (IA) status for the project is currently "In Progress (unknown study)".
Generated from interconnection queue and public data sources
State
IA
County
Muscatine
Grid Region
MISO (Midcontinent)
Market
ISO/RTO Member
Developer
—
Utility
MUSCATINE POWER AND WATER
Entity
MISO
Service Type
—
Point of Interconnection
Grandview Substation 69 kV
Data Source
LBNL + Live
- ISO / RTO
- MISO
- Trading Hub
- MINN.HUB
- Hub Confidence
- HIGH
- POI Substation
- Grandview East Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.