MISO-J1931
40 MW generation in Iowa, WI · In queue since November 2021 · Proposed COD October 2025
40 MW
Capacity
1
Components
Wind
4y 6m
In Queue
Cluster Study
IA Status
COD target: 2025
Total Duration
3y 11m
Schedule
7 months past proposed COD
Interconnection request submitted to ISO/RTO
MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.
Typical: 30–40 months (historical); 12 months target
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2025-10-01
The proposed MISO-J1931 project is a 40 MW wind generation facility located in Iowa County, Wisconsin. The project is interconnected within the Midcontinent Independent System Operator (MISO) region. The queue entry date for this project is November 30, 2021, with a proposed commercial operation date of October 1, 2025.
The interconnection status for MISO-J1931 is currently in the Cluster Study phase. The point of interconnection (POI) is the Hill Valley 345kV substation. The transmission utility is American Transmission Company.
Generated from interconnection queue and public data sources
State
WI
County
Iowa
Grid Region
MISO (Midcontinent)
Market
ISO/RTO Member
Developer
—
Utility
AMERICAN TRANSMISSION COMPANY
Entity
MISO
Service Type
—
Point of Interconnection
Hill Valley 345kV
Data Source
LBNL + Live
- ISO / RTO
- MISO
- Trading Hub
- MINN.HUB
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- WPS.REDBARN1W
- POI Substation
- Hill Valley Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project MISO-J1931