195 MW generation in Marion, MO · In queue since March 2022 · Proposed COD September 2024
195 MW
Capacity
1
Components
Solar
4y 2m
In Queue
Cluster Study
IA Status
COD target: 2024
Total Duration
2y 6m
Schedule
20 months past proposed COD
Interconnection request submitted to ISO/RTO
MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.
Typical: 30–40 months (historical); 12 months target
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2024-09-01
MISO-J1948 is a proposed solar generation project located in Marion County, Missouri, within the Midcontinent Independent System Operator (MISO) region. The project, with a total capacity of 195 MW, is being developed by Ameren Missouri. It consists of 195 MW of solar photovoltaic generation.
The project is currently in the MISO interconnection queue with an entry date of March 23, 2022. The proposed commercial operation date is September 1, 2024. Its interconnection agreement status is listed as "Cluster Study". The point of interconnection is the Hannibal west 161 kV substation.
Generated from interconnection queue and public data sources
State
MO
County
Marion
Grid Region
MISO (Midcontinent)
Market
ISO/RTO Member
Developer
—
Utility
AMEREN MISSOURI
Entity
MISO
Service Type
—
Point of Interconnection
Hannibal west 161 kV
Data Source
LBNL + Live
- ISO / RTO
- MISO
- Trading Hub
- ILLINOIS.HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.