MISO-J2189
15.6 MW generation in Mcdonough, IL · In queue since August 2021 · Proposed COD December 2019
15.6 MW
Capacity
1
Components
Wind
4y 9m
In Queue
Cluster Study
IA Status
COD target: 2019
Total Duration
4y 9m
Schedule
78 months past proposed COD
Interconnection request submitted to ISO/RTO
MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.
Typical: 30–40 months (historical); 12 months target
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2019-12-01
MISO-J2189 is a proposed wind generation project with a total capacity of 15.6 MW, located in McDonough County, Illinois. The project is in the MISO interconnection queue, having entered the queue on August 17, 2021. The proposed commercial operation date is December 1, 2019. The project's interconnection status is currently in the Cluster Study phase. Ameren Illinois is the utility associated with the point of interconnection at the Hornsby Switching Station.
The development project consists of 15.6 MW of wind generation capacity. It is currently listed as active within the MISO queue.
Generated from interconnection queue and public data sources
State
IL
County
Mcdonough
Grid Region
MISO (Midcontinent)
Market
ISO/RTO Member
Developer
—
Utility
AMEREN ILLINOIS
Entity
MISO
Service Type
—
Point of Interconnection
Hornsby Switching Station
Data Source
LBNL + Live
- ISO / RTO
- MISO
- Trading Hub
- ILLINOIS.HUB
- Hub Confidence
- HIGH
- POI Substation
- Hornsby Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project MISO-J2189