150 MW storage in Adams, IL · In queue since March 2022 · Proposed COD September 2024
150 MW
Capacity
1
Components
Battery
4y 2m
In Queue
Cluster Study
IA Status
COD target: 2024
Total Duration
2y 6m
Schedule
19 months past proposed COD
Interconnection request submitted to ISO/RTO
MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.
Typical: 30–40 months (historical); 12 months target
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2024-09-30
MISO-J2203 is a proposed 150 MW battery storage project located in Adams County, Illinois. The project is interconnected within the Midcontinent Independent System Operator (MISO) queue, having entered the queue on March 25, 2022. The proposed commercial operation date is September 30, 2024. The project's interconnection status is currently in the Cluster Study phase.
The development project is located within the Ameren Illinois utility service area. The point of interconnection (POI) is the EAST QUINCY substation.
Generated from interconnection queue and public data sources
State
IL
County
Adams
Grid Region
MISO (Midcontinent)
Market
ISO/RTO Member
Developer
—
Utility
AMEREN ILLINOIS
Entity
MISO
Service Type
—
Point of Interconnection
EAST QUINCY
Data Source
LBNL + Live
- ISO / RTO
- MISO
- Trading Hub
- ILLINOIS.HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project MISO-J2203