MISO-J2275
250 MW generation in Peoria, IL · In queue since March 2022 · Proposed COD October 2025
250 MW
Capacity
1
Components
Wind
4y 2m
In Queue
Cluster Study
IA Status
COD target: 2025
Total Duration
3y 7m
Schedule
6 months past proposed COD
Interconnection request submitted to ISO/RTO
MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.
Typical: 30–40 months (historical); 12 months target
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2025-10-31
MISO-J2275 is a proposed 250 MW wind generation project located in Peoria County, Illinois. The project, which interconnects to Ameren Illinois via the Fargo to Sandburg 345kV point of interconnection, entered the MISO interconnection queue on March 22, 2022. Its proposed commercial operation date is October 31, 2025. The project's interconnection status is currently in the Cluster Study phase.
The development project consists solely of 250 MW of wind generation capacity. It is currently listed as an active project within the MISO queue.
Generated from interconnection queue and public data sources
State
IL
County
Peoria
Grid Region
MISO (Midcontinent)
Market
ISO/RTO Member
Developer
—
Utility
AMEREN ILLINOIS
Entity
MISO
Service Type
—
Point of Interconnection
Fargo to Sandburg 345kV
Data Source
LBNL + Live
- ISO / RTO
- MISO
- Trading Hub
- ILLINOIS.HUB
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- AMIL.FARGO.MVP
- POI Substation
- Fargo
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project MISO-J2275