MISO-J2283
16.1 MW generation in Hillsdale, MI · In queue since November 2021 · Proposed COD October 2020
16.1 MW
Capacity
1
Components
Wind
4y 6m
In Queue
Cluster Study
IA Status
COD target: 2020
Total Duration
4y 6m
Schedule
68 months past proposed COD
Interconnection request submitted to ISO/RTO
MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.
Typical: 30–40 months (historical); 12 months target
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2020-10-01
MISO-J2283 is a proposed wind generation project located in Hillsdale County, Michigan, with a total capacity of 16.1 MW. The project, which is in the MISO interconnection queue under the queue ID MISO-J2283, was entered into the queue on November 19, 2021. The proposed commercial operation date is October 1, 2020. The project's interconnection status is currently in the Cluster Study phase.
The project is being developed within the METC utility territory and interconnects at the 18Knowles point of interconnection (MISO node #256632). The developer is not specified in the available data. The project has appeared in recent news coverage.
Generated from interconnection queue and public data sources
State
MI
County
Hillsdale
Grid Region
MISO (Midcontinent)
Market
ISO/RTO Member
Developer
—
Utility
METC
Entity
MISO
Service Type
—
Point of Interconnection
18Knowles (MISO node #256632)
Data Source
LBNL + Live
- ISO / RTO
- MISO
- Trading Hub
- MICHIGAN.HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project MISO-J2283