MISO-J2288
175 MW generation in Audrain, MO · In queue since March 2022 · Proposed COD June 2025
175 MW
Capacity
1
Components
Solar
4y 2m
In Queue
Cluster Study
IA Status
COD target: 2025
Total Duration
3y 3m
Schedule
11 months past proposed COD
Interconnection request submitted to ISO/RTO
MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.
Typical: 30–40 months (historical); 12 months target
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2025-06-01
The proposed MISO-J2288 project is a 175 MW solar generation project located in Audrain County, Missouri. The project is in the Midcontinent Independent System Operator (MISO) interconnection queue, having entered the queue on March 24, 2022. The proposed commercial operation date is June 1, 2025. Ameren Missouri is the utility associated with the project.
The interconnection status is currently in the Cluster Study phase. The point of interconnection (POI) is the J956 collector substation at 345kV.
Generated from interconnection queue and public data sources
State
MO
County
Audrain
Grid Region
MISO (Midcontinent)
Market
ISO/RTO Member
Developer
—
Utility
AMEREN MISSOURI
Entity
MISO
Service Type
—
Point of Interconnection
J956 collector substation (345kv; same ownership as other project connecting to sub, so no consent a
Data Source
LBNL + Live
- ISO / RTO
- MISO
- Trading Hub
- ILLINOIS.HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.