MISO-J2342
230 MW generation in Worth, IA · In queue since September 2022 · Proposed COD May 2027
230 MW
Capacity
1
Components
Wind
3y 8m
In Queue
Cluster Study
IA Status
COD target: 2027
Total Duration
4y 8m
Interconnection request submitted to ISO/RTO
MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.
Typical: 30–40 months (historical); 12 months target
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2027-05-15
MISO-J2342 is a proposed wind generation project with a total capacity of 230 MW, located in Worth County, Iowa. The project is in the Midcontinent Independent System Operator (MISO) interconnection queue, having entered the queue on September 15, 2022. The proposed commercial operation date is May 15, 2027. The interconnection status is currently in the Cluster Study phase.
The project is being developed within the ITC Midwest utility territory. The point of interconnection (POI) is designated as Worth County.
Generated from interconnection queue and public data sources
State
IA
County
Worth
Grid Region
MISO (Midcontinent)
Market
ISO/RTO Member
Developer
—
Utility
ITC MIDWEST
Entity
MISO
Service Type
—
Point of Interconnection
Worth County
Data Source
LBNL + Live
- ISO / RTO
- MISO
- Trading Hub
- MINN.HUB
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- ALTW.TOI_2.3
- POI Substation
- Worth County Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project MISO-J2342