MISO-J2404
38.8 MW storage in East Baton Rouge Parish, LA · In queue since September 2022 · Proposed COD November 2025
38.8 MW
Capacity
1
Components
Battery
3y 8m
In Queue
In Progress (unknown study)
IA Status
COD target: 2025
Total Duration
3y 2m
Schedule
6 months past proposed COD
Interconnection request submitted to ISO/RTO
MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.
Typical: 30–40 months (historical); 12 months target
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2025-11-01
MISO-J2404 is a proposed battery storage project located in East Baton Rouge Parish, Louisiana, within the MISO region. The project, with a total capacity of 38.8 MW, consists entirely of battery storage. Entergy Louisiana is the utility associated with the project.
The project entered the MISO interconnection queue on September 15, 2022, with a proposed commercial operation date of November 1, 2025. Its interconnection agreement status is currently listed as "In Progress (unknown study)".
Generated from interconnection queue and public data sources
State
LA
County
East Baton Rouge Parish
Grid Region
MISO (Midcontinent)
Market
ISO/RTO Member
Developer
—
Utility
ENTERGY LOUISIANA
Entity
MISO
Service Type
—
Point of Interconnection
EAST
Data Source
LBNL + Live
- ISO / RTO
- MISO
- Trading Hub
- LOUISIANA.HUB
- Hub Confidence
- HIGH
- POI Substation
- East Lima Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project MISO-J2404