MISO-J2495
100 MW generation in Benton, MN · In queue since September 2022 · Proposed COD April 2026
100 MW
Capacity
1
Components
Solar
3y 8m
In Queue
Cluster Study
IA Status
COD target: 2026
Total Duration
3y 7m
Schedule
0 months past proposed COD
Interconnection request submitted to ISO/RTO
MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.
Typical: 30–40 months (historical); 12 months target
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2026-04-29
The proposed MISO-J2495 project is a 100 MW solar generation project located in Benton County, Minnesota. The project, which is being developed by Great River Energy, entered the MISO interconnection queue on September 13, 2022, with a proposed commercial operation date of April 29, 2026. Its interconnection status is currently in the Cluster Study phase.
The project consists of 100 MW of solar photovoltaic generation. The point of interconnection is the Benton County 115 kV substation.
Generated from interconnection queue and public data sources
State
MN
County
Benton
Grid Region
MISO (Midcontinent)
Market
ISO/RTO Member
Developer
—
Utility
GREAT RIVER ENERGY
Entity
MISO
Service Type
—
Point of Interconnection
Benton County 115 kV
Data Source
LBNL + Live
- ISO / RTO
- MISO
- Trading Hub
- MINN.HUB
- Hub Confidence
- HIGH
- POI Substation
- Benton County Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project MISO-J2495