Project MISO-J2634 — Project Summary

Queue ID
MISO-J2634
Capacity
131.1 MW
Technology
Solar
Status
active
Location
Ouachita, AR
Region
MISO
Developer
IA Status
In Progress (unknown study)

MISO-J2634

MISO-J2634BetaActiveSolarMISOLBNL + Live

131.1 MW generation in Ouachita, AR · In queue since September 2022 · Proposed COD June 2025

131.1 MW

Capacity

1

Components

Solar

3y 8m

In Queue

In Progress (unknown study)

IA Status

COD target: 2025

Interconnection

Total Duration

2y 9m

Schedule

11 months past proposed COD

In Study38%
Queue EntrySep 12, 2022

Interconnection request submitted to ISO/RTO

DPP StudyCurrent

MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.

Typical: 30–40 months (historical); 12 months target

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2025-06-01

About

MISO-J2634 is a proposed solar generation project with a total capacity of 131.1 MW, located in Ouachita County, Arkansas. The project is in the Midcontinent Independent System Operator (MISO) interconnection queue, with an entry date of September 12, 2022. The proposed commercial operation date is June 1, 2025. The project's interconnection agreement status is listed as "In Progress (unknown study)". Entergy Arkansas is the utility associated with the project.

The point of interconnection for MISO-J2634 is the Camden Maguire - Smackover 115.0kV line. The development project consists solely of solar photovoltaic generation, with the full 131.1 MW capacity attributed to solar technology.

Generated from interconnection queue and public data sources

Project Details

State

AR

County

Ouachita

Grid Region

MISO (Midcontinent)

Market

ISO/RTO Member

Developer

Utility

ENTERGY ARKANSAS

Entity

MISO

Service Type

Point of Interconnection

CAMDEN MAGUIRE - SMACKOVER 115.0kV

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
MISO
Trading Hub
ARKANSAS.HUB
Hub Confidence
MEDIUM

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.