MISO-J2634
131.1 MW generation in Ouachita, AR · In queue since September 2022 · Proposed COD June 2025
131.1 MW
Capacity
1
Components
Solar
3y 8m
In Queue
In Progress (unknown study)
IA Status
COD target: 2025
Total Duration
2y 9m
Schedule
11 months past proposed COD
Interconnection request submitted to ISO/RTO
MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.
Typical: 30–40 months (historical); 12 months target
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2025-06-01
MISO-J2634 is a proposed solar generation project with a total capacity of 131.1 MW, located in Ouachita County, Arkansas. The project is in the Midcontinent Independent System Operator (MISO) interconnection queue, with an entry date of September 12, 2022. The proposed commercial operation date is June 1, 2025. The project's interconnection agreement status is listed as "In Progress (unknown study)". Entergy Arkansas is the utility associated with the project.
The point of interconnection for MISO-J2634 is the Camden Maguire - Smackover 115.0kV line. The development project consists solely of solar photovoltaic generation, with the full 131.1 MW capacity attributed to solar technology.
Generated from interconnection queue and public data sources
State
AR
County
Ouachita
Grid Region
MISO (Midcontinent)
Market
ISO/RTO Member
Developer
—
Utility
ENTERGY ARKANSAS
Entity
MISO
Service Type
—
Point of Interconnection
CAMDEN MAGUIRE - SMACKOVER 115.0kV
Data Source
LBNL + Live
- ISO / RTO
- MISO
- Trading Hub
- ARKANSAS.HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.