Project MISO-J2738 — Project Summary

Queue ID
MISO-J2738
Capacity
128 MW
Technology
Solar+Battery
Status
active
Location
Rock Island, IL
Region
MISO
Developer
IA Status
Cluster Study

MISO-J2738

MISO-J2738BetaActiveSolarBatteryMISOLBNL + Live

128 MW hybrid in Rock Island, IL · In queue since September 2022 · Proposed COD February 2025

128 MW

Capacity

1

Components

Solar

3y 8m

In Queue

Cluster Study

IA Status

COD target: 2025

Interconnection

Total Duration

2y 5m

Schedule

15 months past proposed COD

Impact Study25%
Queue EntrySep 15, 2022

Interconnection request submitted to ISO/RTO

DPP StudyCurrent

MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.

Typical: 30–40 months (historical); 12 months target

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2025-02-01

About

MISO-J2738 is a proposed 128 MW hybrid solar and battery energy storage project located in Rock Island County, Illinois. The project, which consists of 128 MW of solar generation, is being developed within the Midcontinent Independent System Operator (MISO) region and is interconnected to the MIDAMERICAN ENERGY CO. utility grid at the point of interconnection SUB 17.

The project entered the MISO interconnection queue on September 15, 2022, and has a proposed commercial operation date of February 1, 2025. Its interconnection status is currently in the Cluster Study phase. The project is listed as active in the interconnection queue.

Generated from interconnection queue and public data sources

Project Details

State

IL

County

Rock Island

Grid Region

MISO (Midcontinent)

Market

ISO/RTO Member

Developer

Utility

MIDAMERICAN ENERGY CO.

Entity

MISO

Service Type

Point of Interconnection

SUB 17

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
MISO
Trading Hub
ILLINOIS.HUB
Hub Confidence
HIGH
POI Substation
Sub 91

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Project MISO-J2738