Project MISO-J2750 — Project Summary

Queue ID
MISO-J2750
Capacity
197.5 MW
Technology
Solar
Status
active
Location
Phillips, AR
Region
MISO
Developer
IA Status
In Progress (unknown study)

MISO-J2750

MISO-J2750BetaActiveSolarMISOLBNL + Live

197.5 MW generation in Phillips, AR · In queue since September 2022 · Proposed COD January 2026

197.5 MW

Capacity

1

Components

Solar

3y 8m

In Queue

In Progress (unknown study)

IA Status

COD target: 2026

Interconnection

Total Duration

3y 4m

Schedule

4 months past proposed COD

In Study38%
Queue EntrySep 15, 2022

Interconnection request submitted to ISO/RTO

DPP StudyCurrent

MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.

Typical: 30–40 months (historical); 12 months target

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2026-01-01

About

MISO-J2750 is a proposed solar generation project with a total capacity of 197.5 MW. The project is located in Phillips County, Arkansas, and is being developed within the Entergy Arkansas service area. It entered the Midcontinent Independent System Operator (MISO) interconnection queue on September 15, 2022, with a proposed commercial operation date of January 1, 2026.

The interconnection agreement for MISO-J2750 is currently listed as "In Progress (unknown study)". The point of interconnection is the 230kV Ritchie SES Switchyard - Tarleton line. The project has appeared in recent news coverage.

Generated from interconnection queue and public data sources

Project Details

State

AR

County

Phillips

Grid Region

MISO (Midcontinent)

Market

ISO/RTO Member

Developer

Utility

ENTERGY ARKANSAS

Entity

MISO

Service Type

Point of Interconnection

230kV Ritchie SES Switchyard - Tarleton line

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
MISO
Trading Hub
ARKANSAS.HUB
Hub Confidence
HIGH
POI Substation
Kirk Switchyard

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.