MISO-J2797
150 MW hybrid in White, IL · In queue since September 2022 · Proposed COD September 2026
150 MW
Capacity
1
Components
Solar
3y 8m
In Queue
Cluster Study
IA Status
COD target: 2026
Total Duration
4 years
Interconnection request submitted to ISO/RTO
MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.
Typical: 30–40 months (historical); 12 months target
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2026-09-15
The proposed MISO-J2797 project is a 150 MW hybrid solar and battery energy storage development project located in White County, Illinois. Interconnection is being managed through the Midcontinent Independent System Operator (MISO) queue, with an initial queue entry date of September 15, 2022. The proposed commercial operation date is September 15, 2026.
The project, which will interconnect with Ameren Illinois at the 7NORRIS 345kV point of interconnection, is currently in the Cluster Study phase of the interconnection process. The project consists of 150 MW of solar generation capacity.
Generated from interconnection queue and public data sources
State
IL
County
White
Grid Region
MISO (Midcontinent)
Market
ISO/RTO Member
Developer
—
Utility
AMEREN ILLINOIS
Entity
MISO
Service Type
—
Point of Interconnection
7NORRIS 345kV
Data Source
LBNL + Live
- ISO / RTO
- MISO
- Trading Hub
- ILLINOIS.HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project MISO-J2797