MISO-J2922
250 MW generation in Jasper, IL · In queue since September 2022 · Proposed COD June 2027
250 MW
Capacity
1
Components
Solar
3y 8m
In Queue
Cluster Study
IA Status
COD target: 2027
Total Duration
4y 9m
Interconnection request submitted to ISO/RTO
MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.
Typical: 30–40 months (historical); 12 months target
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2027-06-01
MISO-J2922 is a proposed 250 MW solar generation project located in Jasper County, Illinois. The project is interconnected within the Midcontinent Independent System Operator (MISO) region and is listed in the interconnection queue as of September 14, 2022. The proposed commercial operation date is June 1, 2027.
The interconnection request is currently in the Cluster Study phase. The point of interconnection (POI) is the Newton Switchyard 345 kV Substation, and the utility is Ameren Illinois.
Generated from interconnection queue and public data sources
State
IL
County
Jasper
Grid Region
MISO (Midcontinent)
Market
ISO/RTO Member
Developer
—
Utility
AMEREN ILLINOIS
Entity
MISO
Service Type
—
Point of Interconnection
Newton Switchyard 345 kV Substation
Data Source
LBNL + Live
- ISO / RTO
- MISO
- Trading Hub
- ILLINOIS.HUB
- Hub Confidence
- HIGH
- POI Substation
- Kirk Switchyard
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.