Project MISO-J2945 — Project Summary

Queue ID
MISO-J2945
Capacity
350 MW
Technology
Gas
Status
active
Location
Washington, IA
Region
MISO
Developer
IA Status
Cluster Study

MISO-J2945

MISO-J2945BetaActiveGasMISOLBNL + Live

350 MW generation in Washington, IA · In queue since September 2022 · Proposed COD April 2027

350 MW

Capacity

1

Components

Gas

3y 8m

In Queue

Cluster Study

IA Status

COD target: 2027

Interconnection

Total Duration

4y 7m

Impact Study25%
Queue EntrySep 15, 2022

Interconnection request submitted to ISO/RTO

DPP StudyCurrent

MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.

Typical: 30–40 months (historical); 12 months target

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2027-04-01

About

MISO-J2945 is a proposed 350 MW gas-fired generation project located in Washington County, Iowa. The project is being developed by MidAmerican Energy Co. and interconnected within the Midcontinent Independent System Operator (MISO) region.

The project entered the MISO interconnection queue on September 15, 2022, with a proposed commercial operation date of April 1, 2027. Its interconnection status is currently in the Cluster Study phase.

Generated from interconnection queue and public data sources

Project Details

State

IA

County

Washington

Grid Region

MISO (Midcontinent)

Market

ISO/RTO Member

Developer

Utility

MIDAMERICAN ENERGY CO.

Entity

MISO

Service Type

Point of Interconnection

1

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
MISO
Trading Hub
MINN.HUB
Hub Confidence
MEDIUM

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Project MISO-J2945