Project MISO-J2982 — Project Summary

Queue ID
MISO-J2982
Capacity
35 MW
Technology
Solar
Status
active
Location
Warren, IL
Region
MISO
Developer
IA Status
Cluster Study

MISO-J2982

MISO-J2982BetaActiveSolarMISOLBNL + Live

35 MW generation in Warren, IL · In queue since September 2022 · Proposed COD September 2023

35 MW

Capacity

1

Components

Solar

3y 8m

In Queue

Cluster Study

IA Status

COD target: 2023

Interconnection

Total Duration

1 year

Schedule

32 months past proposed COD

Impact Study25%
Queue EntrySep 14, 2022

Interconnection request submitted to ISO/RTO

DPP StudyCurrent

MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.

Typical: 30–40 months (historical); 12 months target

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2023-09-30

About

The proposed MISO-J2982 project is a 35 MW solar generation project located in Warren County, Illinois. Interconnection was requested by the developer to the Midcontinent Independent System Operator (MISO) on September 14, 2022, with a proposed commercial operation date of September 30, 2023. The project is currently in the Cluster Study phase of the interconnection process. Ameren Illinois is the utility associated with the project.

The point of interconnection (POI) for the proposed project is the Line 6629 Monmouth 69 kV Switching Station. The project consists solely of 35 MW of solar photovoltaic generation. The project is listed as "active" in the MISO interconnection queue.

Generated from interconnection queue and public data sources

Project Details

State

IL

County

Warren

Grid Region

MISO (Midcontinent)

Market

ISO/RTO Member

Developer

Utility

AMEREN ILLINOIS

Entity

MISO

Service Type

Point of Interconnection

Line 6629 Monmouth 69 kV Switching Station

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
MISO
Trading Hub
ILLINOIS.HUB
Hub Confidence
MEDIUM

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.