MISO-J2982
35 MW generation in Warren, IL · In queue since September 2022 · Proposed COD September 2023
35 MW
Capacity
1
Components
Solar
3y 8m
In Queue
Cluster Study
IA Status
COD target: 2023
Total Duration
1 year
Schedule
32 months past proposed COD
Interconnection request submitted to ISO/RTO
MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.
Typical: 30–40 months (historical); 12 months target
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2023-09-30
The proposed MISO-J2982 project is a 35 MW solar generation project located in Warren County, Illinois. Interconnection was requested by the developer to the Midcontinent Independent System Operator (MISO) on September 14, 2022, with a proposed commercial operation date of September 30, 2023. The project is currently in the Cluster Study phase of the interconnection process. Ameren Illinois is the utility associated with the project.
The point of interconnection (POI) for the proposed project is the Line 6629 Monmouth 69 kV Switching Station. The project consists solely of 35 MW of solar photovoltaic generation. The project is listed as "active" in the MISO interconnection queue.
Generated from interconnection queue and public data sources
State
IL
County
Warren
Grid Region
MISO (Midcontinent)
Market
ISO/RTO Member
Developer
—
Utility
AMEREN ILLINOIS
Entity
MISO
Service Type
—
Point of Interconnection
Line 6629 Monmouth 69 kV Switching Station
Data Source
LBNL + Live
- ISO / RTO
- MISO
- Trading Hub
- ILLINOIS.HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project MISO-J2982