MISO-J2988
175 MW generation in Humboldt, IA · In queue since September 2022 · Proposed COD March 2025
175 MW
Capacity
1
Components
Wind
3y 8m
In Queue
Cluster Study
IA Status
COD target: 2025
Total Duration
2y 6m
Schedule
14 months past proposed COD
Interconnection request submitted to ISO/RTO
MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.
Typical: 30–40 months (historical); 12 months target
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2025-03-15
The proposed MISO-J2988 project is a 175 MW wind generation facility located in Humboldt County, Iowa. The project is being developed within the Midcontinent Independent System Operator (MISO) region and is listed under the queue of MidAmerican Energy Co. It entered the MISO interconnection queue on September 14, 2022, with a proposed commercial operation date of March 15, 2025.
The project's interconnection status is currently in the Cluster Study phase. The point of interconnection (POI) is the J2256 POI - Irvington 345kV line. The project has appeared in recent news.
Generated from interconnection queue and public data sources
State
IA
County
Humboldt
Grid Region
MISO (Midcontinent)
Market
ISO/RTO Member
Developer
—
Utility
MIDAMERICAN ENERGY CO.
Entity
MISO
Service Type
—
Point of Interconnection
J2256 POI - Irvington 345kV line
Data Source
LBNL + Live
- ISO / RTO
- MISO
- Trading Hub
- MINN.HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project MISO-J2988