MISO-J3047
263 MW generation in Adair, IA · In queue since September 2022 · Proposed COD September 2029
263 MW
Capacity
1
Components
Gas
3y 8m
In Queue
Cluster Study
IA Status
COD target: 2029
Total Duration
7 years
Interconnection request submitted to ISO/RTO
MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.
Typical: 30–40 months (historical); 12 months target
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2029-09-01
MISO-J3047 is a proposed 263 MW gas-fired generation project located in Adair County, Iowa. The project is being developed by MidAmerican Energy Co. and interconnected within the Midcontinent Independent System Operator (MISO) region. The project entered the MISO interconnection queue on September 15, 2022, with a proposed commercial operation date of September 1, 2029. Its interconnection status is currently in the Cluster Study phase.
The point of interconnection for MISO-J3047 is the Orient-Atchison County 345kV line. The project consists of 263 MW of gas-fired generation capacity.
Generated from interconnection queue and public data sources
State
IA
County
Adair
Grid Region
MISO (Midcontinent)
Market
ISO/RTO Member
Developer
—
Utility
MIDAMERICAN ENERGY CO.
Entity
MISO
Service Type
—
Point of Interconnection
Orient-Atchison County 345kV
Data Source
LBNL + Live
- ISO / RTO
- MISO
- Trading Hub
- MINN.HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project MISO-J3047