Project MISO-J3076 — Project Summary

Queue ID
MISO-J3076
Capacity
770 MW
Technology
Solar+Battery
Status
active
Location
Wabash, IL
Region
MISO
Developer
IA Status
Cluster Study

MISO-J3076

MISO-J3076BetaActiveSolarBatteryMISOLBNL + Live

770 MW hybrid in Wabash, IL · In queue since September 2022 · Proposed COD November 2025

770 MW

Capacity

1

Components

Solar

3y 8m

In Queue

Cluster Study

IA Status

COD target: 2025

Interconnection

Total Duration

3y 2m

Schedule

5 months past proposed COD

Impact Study25%
Queue EntrySep 15, 2022

Interconnection request submitted to ISO/RTO

DPP StudyCurrent

MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.

Typical: 30–40 months (historical); 12 months target

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2025-11-30

About

MISO-J3076 is a proposed 770 MW hybrid solar and battery project located in Wabash County, Illinois. The project, which consists of 770 MW of solar capacity, is in the MISO interconnection queue, having entered on September 15, 2022. The proposed commercial operation date is November 30, 2025. The interconnecting utility is Ameren Illinois.

The project's interconnection status is currently in the Cluster Study phase. The point of interconnection is the 08GiBSON (PSI) to 7ALBION 345 kV line.

Generated from interconnection queue and public data sources

Project Details

State

IL

County

Wabash

Grid Region

MISO (Midcontinent)

Market

ISO/RTO Member

Developer

Utility

AMEREN ILLINOIS

Entity

MISO

Service Type

Point of Interconnection

08GiBSON (PSI) to 7ALBION 345 kV

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
MISO
Trading Hub
ILLINOIS.HUB
Hub Confidence
MEDIUM

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.