MISO-J3153
160 MW generation in Clinton, IA · In queue since September 2022 · Proposed COD April 2027
160 MW
Capacity
1
Components
Gas
3y 8m
In Queue
Cluster Study
IA Status
COD target: 2027
Total Duration
4y 7m
Interconnection request submitted to ISO/RTO
MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.
Typical: 30–40 months (historical); 12 months target
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2027-04-01
MISO-J3153 is a proposed 160 MW gas-fired generation project located in Clinton County, Iowa. The project is interconnected within the Midcontinent Independent System Operator (MISO) region and is listed in the interconnection queue as of September 15, 2022. The proposed commercial operation date is April 1, 2027. The point of interconnection is the Beaver Channel 161 kV Substation, and the project's interconnection status is currently in the Cluster Study phase.
The project is being developed within the ITC Midwest utility territory. The MISO interconnection queue lists the project entity as MISO.
Generated from interconnection queue and public data sources
State
IA
County
Clinton
Grid Region
MISO (Midcontinent)
Market
ISO/RTO Member
Developer
—
Utility
ITC MIDWEST
Entity
MISO
Service Type
—
Point of Interconnection
Beaver Channel 161 kV Substation
Data Source
LBNL + Live
- ISO / RTO
- MISO
- Trading Hub
- MINN.HUB
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- ALTW.BVR.ARR
- POI Substation
- Beaver Channel Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.