Project MISO-J3184 — Project Summary

Queue ID
MISO-J3184
Capacity
145 MW
Technology
Solar+Battery
Status
active
Location
St. Clair, IL
Region
MISO
Developer
IA Status
Cluster Study

MISO-J3184

MISO-J3184BetaActiveSolarBatteryMISOLBNL + Live

145 MW hybrid in St. Clair, IL · In queue since September 2022 · Proposed COD June 2027

145 MW

Capacity

1

Components

Solar

3y 8m

In Queue

Cluster Study

IA Status

COD target: 2027

Interconnection

Total Duration

4y 9m

Impact Study25%
Queue EntrySep 15, 2022

Interconnection request submitted to ISO/RTO

DPP StudyCurrent

MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.

Typical: 30–40 months (historical); 12 months target

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2027-06-01

About

MISO-J3184 is a proposed 145 MW hybrid solar and battery energy storage project located in St. Clair County, Illinois. The project, consisting of 145 MW of solar generation, is in the Midcontinent Independent System Operator (MISO) interconnection queue. The queue entry date is September 15, 2022, with a proposed commercial operation date of June 1, 2027. The project's interconnection status is currently in the Cluster Study phase.

The proposed project is located within the Ameren Illinois utility service area. The point of interconnection (POI) is the South Belleville (4S BELLVLLE 348811) 138 kV substation.

Generated from interconnection queue and public data sources

Project Details

State

IL

County

St. Clair

Grid Region

MISO (Midcontinent)

Market

ISO/RTO Member

Developer

Utility

AMEREN ILLINOIS

Entity

MISO

Service Type

Point of Interconnection

South Belleville (4S BELLVLLE 348811) 138 kV

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
MISO
Trading Hub
ILLINOIS.HUB
Hub Confidence
HIGH
POI Substation
BELLEVILLE

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.