MISO-J3188
35 MW generation in Marshall, IL · In queue since September 2022 · Proposed COD September 2023
35 MW
Capacity
1
Components
Solar
3y 8m
In Queue
Cluster Study
IA Status
COD target: 2023
Total Duration
1 year
Schedule
32 months past proposed COD
Interconnection request submitted to ISO/RTO
MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.
Typical: 30–40 months (historical); 12 months target
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2023-09-30
The proposed MISO-J3188 project is a 35 MW solar generation facility located in Marshall County, Illinois. Interconnection is being sought through the Midcontinent Independent System Operator (MISO) queue, with an initial queue entry date of September 14, 2022. The proposed commercial operation date is September 30, 2023.
The interconnection status for the project is currently in the Cluster Study phase. The designated point of interconnection (POI) is the Hallock 138 kV substation, and the utility is Ameren Illinois. The project has appeared in recent news coverage regarding renewable energy development in the region.
Generated from interconnection queue and public data sources
State
IL
County
Marshall
Grid Region
MISO (Midcontinent)
Market
ISO/RTO Member
Developer
—
Utility
AMEREN ILLINOIS
Entity
MISO
Service Type
—
Point of Interconnection
Hallock 138 kV
Data Source
LBNL + Live
- ISO / RTO
- MISO
- Trading Hub
- ILLINOIS.HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project MISO-J3188