MISO-J3198
80 MW hybrid in Barron, WI · In queue since September 2022 · Proposed COD December 2026
80 MW
Capacity
1
Components
Solar
3y 8m
In Queue
Cluster Study
IA Status
COD target: 2026
Total Duration
4y 3m
Interconnection request submitted to ISO/RTO
MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.
Typical: 30–40 months (historical); 12 months target
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2026-12-22
MISO-J3198 is a proposed 80 MW hybrid solar and battery project located in Barron County, Wisconsin. The project, which consists of 80 MW of solar generation, is in the MISO interconnection queue as of September 15, 2022, with a proposed commercial operation date of December 22, 2026. The interconnecting utility is Dairyland Power Cooperative.
The project's interconnection status is currently in the Cluster Study phase.
Generated from interconnection queue and public data sources
State
WI
County
Barron
Grid Region
MISO (Midcontinent)
Market
ISO/RTO Member
Developer
—
Utility
DAIRYLAND POWER COOPERATIVE
Entity
MISO
Service Type
—
Point of Interconnection
Barron 161KV
Data Source
LBNL + Live
- ISO / RTO
- MISO
- Trading Hub
- MINN.HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.