Project MISO-J3209 — Project Summary

Queue ID
MISO-J3209
Capacity
467 MW
Technology
Solar
Status
active
Location
Rapides Parish, LA
Region
MISO
Developer
IA Status
In Progress (unknown study)

MISO-J3209

MISO-J3209BetaActiveSolarMISOLBNL + Live

467 MW generation in Rapides Parish, LA · In queue since September 2022 · Proposed COD March 2026

467 MW

Capacity

1

Components

Solar

3y 8m

In Queue

In Progress (unknown study)

IA Status

COD target: 2026

Interconnection

Total Duration

3y 6m

Schedule

2 months past proposed COD

In Study38%
Queue EntrySep 15, 2022

Interconnection request submitted to ISO/RTO

DPP StudyCurrent

MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.

Typical: 30–40 months (historical); 12 months target

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2026-03-01

About

MISO-J3209 is a proposed solar generation project with a total capacity of 467 MW. The project is located in Rapides Parish, Louisiana, and is being developed within the Midcontinent Independent System Operator (MISO) region. The queue entry date for MISO-J3209 is September 15, 2022, with a proposed commercial operation date of March 1, 2026. The interconnecting utility is CLECO POWER.

The interconnection agreement for MISO-J3209 is currently listed as "In Progress (unknown study)". The point of interconnection (POI) is the Hineston 230kV Substation. The project has appeared in the MISO interconnection queue but has not been linked to any existing operating plants or recent news coverage in the energy data platform.

Generated from interconnection queue and public data sources

Project Details

State

LA

County

Rapides Parish

Grid Region

MISO (Midcontinent)

Market

ISO/RTO Member

Developer

Utility

CLECO POWER

Entity

MISO

Service Type

Point of Interconnection

Hineston 230kV Substation

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
MISO
Trading Hub
LOUISIANA.HUB
Hub Confidence
HIGH
POI Substation
Hineston Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.