MISO-J3223
88 MW hybrid in Edwards, IL · In queue since September 2022 · Proposed COD March 2027
88 MW
Capacity
1
Components
Solar
3y 8m
In Queue
Cluster Study
IA Status
COD target: 2027
Total Duration
4y 6m
Interconnection request submitted to ISO/RTO
MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.
Typical: 30–40 months (historical); 12 months target
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2027-03-01
MISO-J3223 is a proposed 88 MW hybrid solar and battery project located in Edwards County, Illinois. The project, which consists of 88 MW of solar capacity, is in the Midcontinent Independent System Operator (MISO) interconnection queue. The queue entry date is September 15, 2022, with a proposed commercial operation date of March 1, 2027. The interconnection status is currently in the Cluster Study phase. The interconnecting utility is Ameren Illinois.
The point of interconnection (POI) is the Olney (4JASPER 347868) - Albion (4ALBION N 346510) 138 kV line.
Generated from interconnection queue and public data sources
State
IL
County
Edwards
Grid Region
MISO (Midcontinent)
Market
ISO/RTO Member
Developer
—
Utility
AMEREN ILLINOIS
Entity
MISO
Service Type
—
Point of Interconnection
Olney (4JASPER 347868) - Albion (4ALBION N 346510) 138 kV
Data Source
LBNL + Live
- ISO / RTO
- MISO
- Trading Hub
- ILLINOIS.HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project MISO-J3223