MISO-J3592
57 MW generation in Sunflower, MS · In queue since April 2024 · Proposed COD April 2028
57 MW
Capacity
1
Components
Wind
2y 1m
In Queue
—
IA Status
COD target: 2028
Total Duration
4 years
Interconnection request submitted to ISO/RTO
MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.
Typical: 30–40 months (historical); 12 months target
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-04-01
MISO-J3592 is a proposed 57 MW wind generation project located in Sunflower County, Mississippi. The project was entered into the Midcontinent Independent System Operator (MISO) interconnection queue on April 18, 2024, with a proposed commercial operation date of April 1, 2028. The interconnecting utility is Entergy Mississippi, LLC.
The project, which consists of 57 MW of wind capacity, is currently listed as active in the MISO queue. The point of interconnection (POI) is the Indianola 230/115 kV substation to the Tillatoba 230 kV line.
Generated from interconnection queue and public data sources
State
MS
County
Sunflower
Grid Region
MISO (Midcontinent)
Market
ISO/RTO Member
Developer
—
Utility
ENTERGY MISSISSIPPI, LLC.
Entity
MISO
Service Type
—
Point of Interconnection
INDIANOLA 230/115 SUB - TILLATOBA 230.0kV
Data Source
LBNL + Live
- ISO / RTO
- MISO
- Trading Hub
- LOUISIANA.HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project MISO-J3592