MISO-J3653
80 MW generation in Washtenaw, MI · In queue since April 2024 · Proposed COD June 2028
80 MW
Capacity
1
Components
Solar
2y 1m
In Queue
—
IA Status
COD target: 2028
Total Duration
4y 2m
Interconnection request submitted to ISO/RTO
MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.
Typical: 30–40 months (historical); 12 months target
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-06-01
MISO-J3653 is a proposed solar generation project located in Washtenaw County, Michigan, within the Midcontinent Independent System Operator (MISO) region. The project, with a total capacity of 80 MW, consists entirely of solar photovoltaic technology. It is interconnected to the ITC utility grid at the Superior 120 kV point of interconnection.
The project entered the MISO interconnection queue on April 5, 2024, and has a proposed commercial operation date of June 1, 2028. As of the latest data, the project's interconnection status is listed as active.
Generated from interconnection queue and public data sources
State
MI
County
Washtenaw
Grid Region
MISO (Midcontinent)
Market
ISO/RTO Member
Developer
—
Utility
ITC
Entity
MISO
Service Type
—
Point of Interconnection
Superior 120 kV
Data Source
LBNL + Live
- ISO / RTO
- MISO
- Trading Hub
- MICHIGAN.HUB
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- DECO.SUPP111
- POI Substation
- Superior Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project MISO-J3653