Project MISO-J3856 — Project Summary

Queue ID
MISO-J3856
Capacity
235 MW
Technology
Wind
Status
active
Location
Wabash, IL
Region
MISO
Developer
IA Status

MISO-J3856

MISO-J3856BetaActiveWindMISOLBNL + Live

235 MW generation in Wabash, IL · In queue since December 2024 · Proposed COD April 2030

235 MW

Capacity

1

Components

Wind

1y 5m

In Queue

IA Status

COD target: 2030

Interconnection

Total Duration

5y 4m

Pre-Study0%
Queue EntryDec 26, 2024

Interconnection request submitted to ISO/RTO

DPP Study

MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.

Typical: 30–40 months (historical); 12 months target

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2030-04-01

About

The proposed MISO-J3856 project is a 235 MW wind generation facility located in Wabash County, Illinois. The project is being developed within the Ameren Illinois service area and interconnected to the MISO grid at the 08GIBSON (PSI) - 7ALBION 345.0kV point of interconnection.

The project entered the MISO interconnection queue on December 26, 2024, and currently has an active status. The proposed commercial operation date is April 1, 2030.

Generated from interconnection queue and public data sources

Project Details

State

IL

County

Wabash

Grid Region

MISO (Midcontinent)

Market

ISO/RTO Member

Developer

Utility

AMEREN ILLINOIS

Entity

MISO

Service Type

Point of Interconnection

08GIBSON (PSI) - 7ALBION 345.0kV

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
MISO
Trading Hub
ILLINOIS.HUB
Hub Confidence
MEDIUM

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.