Project MISO-J3886 — Project Summary

Queue ID
MISO-J3886
Capacity
300 MW
Technology
Wind
Status
active
Location
Swift, MN
Region
MISO
Developer
IA Status

MISO-J3886

MISO-J3886BetaActiveWindMISOLive · MISO

300 MW generation in Swift, MN · In queue since February 2025

300 MW

Capacity

0

Components

1y 3m

In Queue

IA Status

Interconnection

Total Duration

1y 3m

Study Phase

Phase 1

Pre-Study0%
Queue EntryFeb 11, 2025

Interconnection request submitted to ISO/RTO

DPP Study

MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.

Typical: 30–40 months (historical); 12 months target

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Commercial operation date not yet determined

About

MISO-J3886 is a proposed 300 MW wind generation project located in Swift County, Minnesota. The project is in the Midcontinent Independent System Operator (MISO) interconnection queue, with an entry date of February 11, 2025. The proposed point of interconnection (POI) is the Big Stone South - Alexandria 345kV line.

The project's interconnection service type is Network Resource Interconnection Service (NRIS), and it is currently in Phase 1 of the study process. The project's status is listed as active.

Generated from interconnection queue and public data sources

Project Details

State

MN

County

Swift

Grid Region

MISO (Midcontinent)

Market

ISO/RTO Member

Developer

Utility

Entity

MISO

Service Type

NRIS

Point of Interconnection

Big Stone South - Alexandria 345kV

Data Source

Live · MISO

Market Context
Approximate
ISO / RTO
MISO
Trading Hub
MINN.HUB
Hub Confidence
HIGH
POI Substation
Alexandria

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.