MISO-J3895
199.72 MW generation in Muskegon, MI · In queue since February 2025
199.72 MW
Capacity
0
Components
1y 3m
In Queue
—
IA Status
Total Duration
1y 3m
Study Phase
Phase 1
Interconnection request submitted to ISO/RTO
MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.
Typical: 30–40 months (historical); 12 months target
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Commercial operation date not yet determined
MISO-J3895 is a proposed wind generation project located in Muskegon County, Michigan, with a total capacity of 199.72 MW. The project is in the Midcontinent Independent System Operator (MISO) interconnection queue, having entered the queue on February 7, 2025. The designated point of interconnection (POI) is the KENOWA - LUDINGTON 345.0kV line. The project's service type is Network Resource Interconnection Service (NRIS), and it is currently in Phase 1 of the study phase.
The project is listed as active in the MISO queue and is being developed within the METC utility territory.
Generated from interconnection queue and public data sources
State
MI
County
Muskegon
Grid Region
MISO (Midcontinent)
Market
ISO/RTO Member
Developer
—
Utility
METC
Entity
MISO
Service Type
NRIS
Point of Interconnection
KENOWA - LUDINGTON 345.0kV
Data Source
Live · MISO
- ISO / RTO
- MISO
- Trading Hub
- MICHIGAN.HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project MISO-J3895