MISO-J3922
1,445 MW generation in Branch, MI · In queue since March 2025
1,445 MW
Capacity
0
Components
1y 2m
In Queue
—
IA Status
Total Duration
1y 2m
Study Phase
Phase 1
Interconnection request submitted to ISO/RTO
MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.
Typical: 30–40 months (historical); 12 months target
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Commercial operation date not yet determined
MISO-J3922 is a proposed generation project located in Branch County, Michigan, within the Midcontinent Independent System Operator (MISO) region. The project, with a total capacity of 1445 MW, utilizes gas-fired technology. The queue entry date is March 4, 2025. Michigan Electric Transmission Company (METC) is the interconnecting utility.
The project's interconnection request is currently active in the MISO queue under service type NRIS (Network Resource Interconnection Service) and is in Phase 1 of the study phase. The point of interconnection (POI) is HIPLE.
Generated from interconnection queue and public data sources
State
MI
County
Branch
Grid Region
MISO (Midcontinent)
Market
ISO/RTO Member
Developer
—
Utility
METC
Entity
MISO
Service Type
NRIS
Point of Interconnection
HIPLE
Data Source
Live · MISO
- ISO / RTO
- MISO
- Trading Hub
- MICHIGAN.HUB
- Hub Confidence
- HIGH
- POI Substation
- Hiple Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project MISO-J3922