MISO-J3993
21.44 MW generation in Wayne, IL · In queue since April 2025
21.44 MW
Capacity
0
Components
1y 1m
In Queue
—
IA Status
Total Duration
1y 1m
Study Phase
Phase 1
Interconnection request submitted to ISO/RTO
MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.
Typical: 30–40 months (historical); 12 months target
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Commercial operation date not yet determined
MISO-J3993 is a proposed solar generation project with a total capacity of 21.44 MW, located in Wayne County, Illinois. The project is in the Midcontinent Independent System Operator (MISO) interconnection queue, under the queue ID MISO-J3993. Hoosier Energy is the utility associated with the project.
The project entered the MISO queue on April 29, 2025, and is currently in Phase 1 of the study phase. The designated point of interconnection (POI) is Geff, and the service type is Network Resource Interconnection Service (NRIS). The project's status is currently listed as active.
Generated from interconnection queue and public data sources
State
IL
County
Wayne
Grid Region
MISO (Midcontinent)
Market
ISO/RTO Member
Developer
—
Utility
HOOSIER ENERGY
Entity
MISO
Service Type
NRIS
Point of Interconnection
Geff
Data Source
Live · MISO
- ISO / RTO
- MISO
- Trading Hub
- ILLINOIS.HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project MISO-J3993