MISO-J4113
787.4 MW generation in Cerro Gordo, IA · In queue since October 2025
787.4 MW
Capacity
0
Components
7 months
In Queue
—
IA Status
Total Duration
7 months
Study Phase
Phase 1
Interconnection request submitted to ISO/RTO
MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.
Typical: 30–40 months (historical); 12 months target
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Commercial operation date not yet determined
MISO-J4113 is a proposed 787.4 MW gas-fired generation project located in Cerro Gordo County, Iowa. The project is in the Midcontinent Independent System Operator (MISO) interconnection queue, having entered the queue on October 6, 2025. The designated point of interconnection (POI) is Killdeer, and the requested service type is NRIS (Network Resource Interconnection Service). The project is currently in Phase 1 of the study phase.
The interconnection utility is ITC Midwest, and the project is sponsored by an entity within MISO. The project's status is currently listed as active within the MISO queue.
Generated from interconnection queue and public data sources
State
IA
County
Cerro Gordo
Grid Region
MISO (Midcontinent)
Market
ISO/RTO Member
Developer
—
Utility
ITC MIDWEST
Entity
MISO
Service Type
NRIS
Point of Interconnection
Killdeer
Data Source
Live · MISO
- ISO / RTO
- MISO
- Trading Hub
- MINN.HUB
- Hub Confidence
- HIGH
- POI Substation
- Killdeer Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project MISO-J4113