MISO-J4130
110 MW generation in Pepin, WI · In queue since October 2025
110 MW
Capacity
0
Components
7 months
In Queue
—
IA Status
Total Duration
7 months
Study Phase
Phase 1
Interconnection request submitted to ISO/RTO
MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.
Typical: 30–40 months (historical); 12 months target
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Commercial operation date not yet determined
MISO-J4130 is a proposed solar generation project with a total capacity of 110 MW located in Pepin County, Wisconsin. The project is being developed within the Dairyland Power Cooperative service area and is interconnected to the Midcontinent Independent System Operator (MISO) queue.
The project entered the MISO interconnection queue on October 1, 2025. It is currently in Phase 1 of the study phase and has a service type of NRIS (Network Resource Interconnection Service). The point of interconnection (POI) is the Alma - Rock Elm 161.0kV line.
Generated from interconnection queue and public data sources
State
WI
County
Pepin
Grid Region
MISO (Midcontinent)
Market
ISO/RTO Member
Developer
—
Utility
DAIRYLAND POWER COOPERATIVE
Entity
MISO
Service Type
NRIS
Point of Interconnection
ALMA - ROCK ELM 161.0kV
Data Source
Live · MISO
- ISO / RTO
- MISO
- Trading Hub
- MINN.HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project MISO-J4130