Project MISO-J4159 — Project Summary

Queue ID
MISO-J4159
Capacity
664 MW
Technology
Gas
Status
active
Location
Ottawa, MI
Region
MISO
Developer
IA Status

MISO-J4159

MISO-J4159BetaActiveGasMISOLive · MISO

664 MW generation in Ottawa, MI · In queue since August 2025

664 MW

Capacity

0

Components

9 months

In Queue

IA Status

Interconnection

Total Duration

9 months

Pre-Study0%
Queue EntryAug 13, 2025

Interconnection request submitted to ISO/RTO

DPP Study

MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.

Typical: 30–40 months (historical); 12 months target

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Commercial operation date not yet determined

About

MISO-J4159 is a proposed 664 MW gas-fired generation project located in Ottawa County, Michigan. The project is in the Midcontinent Independent System Operator (MISO) interconnection queue, with an entry date of August 13, 2025. The designated utility is METC, and the point of interconnection (POI) is ROOSEVELT. The service type requested is NRIS (Network Resource Interconnection Service).

The project is currently listed as active in the MISO queue. No proposed commercial operation date or interconnection agreement (IA) status is available in the provided data. There is no indication of an EIA match to an existing operating plant, nor is there any information about recent news coverage.

Generated from interconnection queue and public data sources

Project Details

State

MI

County

Ottawa

Grid Region

MISO (Midcontinent)

Market

ISO/RTO Member

Developer

Utility

METC

Entity

MISO

Service Type

NRIS

Point of Interconnection

ROOSEVELT

Data Source

Live · MISO

Market Context
Approximate
ISO / RTO
MISO
Trading Hub
MICHIGAN.HUB
Hub Confidence
HIGH
Nearest Node (Estimated)
CONS.ZEELAND1A
POI Substation
Roosevelt Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Project MISO-J4159