MISO-J4160
55 MW generation in Ottawa, MI · In queue since August 2025
55 MW
Capacity
0
Components
9 months
In Queue
—
IA Status
Total Duration
9 months
Study Phase
Phase 1
Interconnection request submitted to ISO/RTO
MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.
Typical: 30–40 months (historical); 12 months target
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Commercial operation date not yet determined
MISO-J4160 is a proposed 55 MW natural gas generation project located in Ottawa County, Michigan. The project is listed in the Midcontinent Independent System Operator (MISO) interconnection queue, having entered the queue on August 13, 2025. The designated point of interconnection (POI) is the Roosevelt substation. The project's service type is Network Resource Interconnection Service (NRIS), and it is currently in Phase 1 of the study phase.
The project is being developed within the Michigan Electric Transmission Company (METC) service area. As of the latest data, the project's status is listed as active within the MISO queue.
Generated from interconnection queue and public data sources
State
MI
County
Ottawa
Grid Region
MISO (Midcontinent)
Market
ISO/RTO Member
Developer
—
Utility
METC
Entity
MISO
Service Type
NRIS
Point of Interconnection
ROOSEVELT
Data Source
Live · MISO
- ISO / RTO
- MISO
- Trading Hub
- MICHIGAN.HUB
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- CONS.ZEELAND1A
- POI Substation
- Roosevelt Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project MISO-J4160