MISO-J485
47 MW generation in MN · In queue since October 2015 · Proposed COD January 2018
47 MW
Capacity
1
Components
Gas
10y 7m
In Queue
IA Executed
IA Status
COD target: 2018
Total Duration
2y 3m
Schedule
101 months past proposed COD
Interconnection request submitted to ISO/RTO
MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.
Typical: 30–40 months (historical); 12 months target
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Project under construction
Typical: 24–48 months
Proposed COD: 2018-01-01
MISO-J485 is a proposed 47 MW natural gas generation project located in Minnesota within the Midcontinent Independent System Operator (MISO) region. The project, consisting of 47 MW of gas-fired capacity, entered the MISO interconnection queue on October 12, 2015, with a proposed commercial operation date of January 1, 2018. The interconnection agreement (IA) for the project has been executed.
The point of interconnection (POI) for MISO-J485 is the West Side Substation located at 5846 19th Street NW in Rochester, MN.
Generated from interconnection queue and public data sources
State
MN
County
—
Grid Region
MISO (Midcontinent)
Market
ISO/RTO Member
Developer
—
Utility
—
Entity
MISO
Service Type
—
Point of Interconnection
West Side Substation - 5846 19th Street NW, Rochester, MN
Data Source
LBNL
- ISO / RTO
- MISO
- Trading Hub
- MINN.HUB
- Hub Confidence
- HIGH
- POI Substation
- Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.