MISO-L004
— generation in OH · In queue since July 2004 · Proposed COD April 2009
—
Capacity
0
Components
21y 10m
In Queue
IA Executed
IA Status
COD target: 2009
Total Duration
4y 9m
Schedule
208 months past proposed COD
Interconnection request submitted to ISO/RTO
MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.
Typical: 30–40 months (historical); 12 months target
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Project under construction
Typical: 12–36 months
Proposed COD: 2009-04-01
The proposed project MISO-L004 is a generation project of unknown technology located in Ohio within the Midcontinent Independent System Operator (MISO) region. The project has a total capacity that is not specified in available data. Its interconnection request was entered into the MISO queue on July 22, 2004, with a proposed commercial operation date of April 1, 2009.
The project's interconnection status is listed as "IA Executed," indicating that an Interconnection Agreement has been finalized. The developer, point of interconnection, and specific county location are not available in the provided data. There is no indication of an EIA match or recent news coverage for this project.
Generated from interconnection queue and public data sources
State
OH
County
—
Grid Region
MISO (Midcontinent)
Market
ISO/RTO Member
Developer
—
Utility
—
Entity
MISO
Service Type
—
Point of Interconnection
Unknown
Data Source
LBNL
- ISO / RTO
- MISO
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project MISO-L004