Surplus; Shelby (MISO-S1052) — Project Summary

Queue ID
MISO-S1052
Capacity
150 MW
Technology
Solar
Status
active
Location
Cumberland, IL
Region
MISO
Developer
IA Status

Surplus; Shelby

MISO-S1052BetaActiveSolarOtherMISOLBNL + Live

150 MW hybrid in Cumberland, IL · In queue since June 2024 · Proposed COD September 2026

150 MW

Capacity

1

Components

Solar

1y 11m

In Queue

IA Status

COD target: 2026

Interconnection

Total Duration

2y 3m

Pre-Study0%
Queue EntryJun 14, 2024

Interconnection request submitted to ISO/RTO

DPP Study

MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.

Typical: 30–40 months (historical); 12 months target

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2026-09-22

About

The Surplus; Shelby development project is a proposed 150 MW hybrid solar project located in Cumberland County, Illinois. Interconnecting to the Ameren Illinois utility, the project consists of 150 MW of solar generation.

The project is listed in the MISO interconnection queue as entry S1052, with a queue entry date of June 14, 2024, and a proposed commercial operation date of September 22, 2026.

Generated from interconnection queue and public data sources

Project Details

State

IL

County

Cumberland

Grid Region

MISO (Midcontinent)

Market

ISO/RTO Member

Developer

Utility

AMEREN ILLINOIS

Entity

MISO

Service Type

Point of Interconnection

Neoga South 138kV

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
MISO
Trading Hub
ILLINOIS.HUB
Hub Confidence
HIGH
POI Substation
South

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Surplus; Shelby