Surplus; G291 (MISO-S1064) — Project Summary

Queue ID
MISO-S1064
Capacity
21 MW
Technology
Battery
Status
active
Location
Region
MISO
Developer
IA Status

Surplus; G291

MISO-S1064BetaActiveOtherBatteryMISOLBNL + Live

21 MW hybrid in · In queue since September 2024 · Proposed COD November 2026

21 MW

Capacity

1

Components

Other

1y 8m

In Queue

IA Status

COD target: 2026

Interconnection

Total Duration

2y 2m

Pre-Study0%
Queue EntrySep 6, 2024

Interconnection request submitted to ISO/RTO

DPP Study

MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.

Typical: 30–40 months (historical); 12 months target

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2026-11-01

About

The Surplus; G291 development project is a proposed 21 MW hybrid energy project consisting of a 21 MW "Other" technology paired with a battery. It is located within the Otter Tail Power Company service area. The project is listed in the Midcontinent Independent System Operator (MISO) interconnection queue as project S1064, with a queue entry date of September 6, 2024, and a proposed commercial operation date of November 1, 2026.

The project is currently in the active phase of the interconnection queue process. The point of interconnection (POI) is at EDGE SS9 41.6 kV.

Generated from interconnection queue and public data sources

Project Details

State

County

Grid Region

MISO (Midcontinent)

Market

ISO/RTO Member

Developer

Utility

OTTER TAIL POWER COMPANY

Entity

MISO

Service Type

Point of Interconnection

EDGE SS9 41.6 kV

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
MISO
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.