MISO-S1076
100 MW generation in Tangipahoa Parish · In queue since January 2025
100 MW
Capacity
0
Components
1y 4m
In Queue
—
IA Status
Total Duration
1y 4m
Interconnection request submitted to ISO/RTO
MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.
Typical: 30–40 months (historical); 12 months target
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Commercial operation date not yet determined
MISO-S1076 is a proposed 100 MW generation project located in Tangipahoa Parish, Louisiana. The project, which utilizes an "Other" technology type, is interconnected with Entergy Louisiana, LLC. It is currently listed as active in the Midcontinent Independent System Operator (MISO) interconnection queue, with a queue entry date of January 7, 2025.
The project's point of interconnection (POI) is the Amite 115kV substation. The service type requested is a System Impact Study (SIS).
Generated from interconnection queue and public data sources
State
—
County
Tangipahoa Parish
Grid Region
MISO (Midcontinent)
Market
ISO/RTO Member
Developer
—
Utility
ENTERGY LOUISIANA, LLC
Entity
MISO
Service Type
SIS
Point of Interconnection
Amite 115kV
Data Source
Live · MISO
- ISO / RTO
- MISO
- Hub Confidence
- UNKNOWN
- Nearest Node (Estimated)
- EES.AMITESO
- POI Substation
- Amite Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.