Project MISO-S1111 — Project Summary

Queue ID
MISO-S1111
Capacity
263 MW
Technology
Other
Status
active
Location
Adair, IA
Region
MISO
Developer
IA Status

MISO-S1111

MISO-S1111BetaActiveHybridMISOLive · MISO

263 MW generation in Adair, IA · In queue since July 2025

263 MW

Capacity

0

Components

10 months

In Queue

IA Status

Interconnection

Total Duration

10 months

Pre-Study0%
Queue EntryJul 31, 2025

Interconnection request submitted to ISO/RTO

DPP Study

MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.

Typical: 30–40 months (historical); 12 months target

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Commercial operation date not yet determined

About

The proposed MISO-S1111 project is a 263 MW hybrid generation project located in Adair County, Iowa. The project, which is listed in the Midcontinent Independent System Operator (MISO) interconnection queue, is being developed by MidAmerican Energy Co. It entered the queue on July 31, 2025.

The project's interconnection status is active, and it is undergoing a System Impact Study (SIS). The technology is listed as "Other" with a detail of "Hybrid", but further component details are not available.

Generated from interconnection queue and public data sources

Project Details

State

IA

County

Adair

Grid Region

MISO (Midcontinent)

Market

ISO/RTO Member

Developer

Utility

MIDAMERICAN ENERGY CO.

Entity

MISO

Service Type

SIS

Point of Interconnection

ORIENT

Data Source

Live · MISO

Market Context
Approximate
ISO / RTO
MISO
Trading Hub
MINN.HUB
Hub Confidence
HIGH
Nearest Node (Estimated)
MEC.ORIENT1
POI Substation
Orient Wind Farm

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.