Project MPC-MPC03800 — Project Summary

Queue ID
MPC-MPC03800
Capacity
250 MW
Technology
Wind
Status
active
Location
Eddy, ND
Region
MISO
Developer
IA Status
Facility Study

MPC-MPC03800

MPC-MPC03800BetaActiveWindMPCLBNL

250 MW generation in Eddy, ND · In queue since February 2019 · Proposed COD November 2023

250 MW

Capacity

1

Components

Wind

7y 3m

In Queue

Facility Study

IA Status

COD target: 2023

Interconnection

Total Duration

4y 9m

Schedule

30 months past proposed COD

Facilities Study50%
Queue EntryFeb 21, 2019

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

Project undergoes interconnection studies to assess grid impact.

Typical: 18–36 months

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2023-11-30

About

MPC-MPC03800 is a proposed 250 MW wind generation project located in Eddy County, North Dakota. The project is being developed by Minnkota Power Cooperative (MPC) and is interconnected within the Midcontinent Independent System Operator (MISO) queue. The project entered the queue on February 21, 2019, with a proposed commercial operation date of November 30, 2023. Its interconnection status is currently in the Facility Study phase, and the point of interconnection is the Center-Prairie 345 kV Line.

The proposed project consists of 250 MW of wind generation capacity. It is listed as an active project in the MISO interconnection queue. The project has appeared in recent news coverage regarding renewable energy development in the region.

Generated from interconnection queue and public data sources

Project Details

State

ND

County

Eddy

Grid Region

MISO (Midcontinent)

Market

ISO/RTO Member

Developer

Utility

Minnkota Power Cooperative

Entity

MPC

Service Type

Point of Interconnection

Center-Prairie 345 kV Line

Data Source

LBNL

Market Context
Approximate
ISO / RTO
MISO
Trading Hub
MINN.HUB
Hub Confidence
MEDIUM

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Project MPC-MPC03800