MPC-MPC03900
151.2 MW generation in Eddy, ND · In queue since April 2019 · Proposed COD November 2023
151.2 MW
Capacity
1
Components
Wind
7y 1m
In Queue
Facility Study
IA Status
COD target: 2023
Total Duration
4y 7m
Schedule
30 months past proposed COD
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2023-11-30
MPC-MPC03900 is a proposed wind generation project with a total capacity of 151.2 MW. The project is located in Eddy County, North Dakota, and is being developed by Minnkota Power Cooperative (MPC). It consists of 151.2 MW of wind power.
The project is currently active in the MISO interconnection queue, with an entry date of April 16, 2019. The proposed commercial operation date is November 30, 2023. The interconnection status is currently in the Facility Study phase, and the point of interconnection is the Center-Prairie 345 kV Line.
Generated from interconnection queue and public data sources
State
ND
County
Eddy
Grid Region
MISO (Midcontinent)
Market
ISO/RTO Member
Developer
—
Utility
Minnkota Power Cooperative
Entity
MPC
Service Type
—
Point of Interconnection
Center-Prairie 345 kV Line
Data Source
LBNL
- ISO / RTO
- MISO
- Trading Hub
- MINN.HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project MPC-MPC03900