MPC-MPC04300
457.3 MW generation in Steele, ND · In queue since July 2021 · Proposed COD November 2024
457.3 MW
Capacity
1
Components
Wind
4y 10m
In Queue
System Impact Study
IA Status
COD target: 2024
Total Duration
3y 4m
Schedule
17 months past proposed COD
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2024-11-30
MPC-MPC04300 is a proposed wind generation project with a total capacity of 457.3 MW, located in Steele County, North Dakota. The project is being developed by Minnkota Power Cooperative (MPC). It is currently active in the MISO interconnection queue, with an entry date of July 15, 2021. The proposed commercial operation date is November 30, 2024.
The project's interconnection status is currently in the System Impact Study phase. The point of interconnection (POI) is the Center-Prairie 345 kV Line. The project has appeared in recent news coverage.
Generated from interconnection queue and public data sources
State
ND
County
Steele
Grid Region
MISO (Midcontinent)
Market
ISO/RTO Member
Developer
—
Utility
Minnkota Power Cooperative
Entity
MPC
Service Type
—
Point of Interconnection
Center-Prairie 345 kV Line
Data Source
LBNL
- ISO / RTO
- MISO
- Trading Hub
- MINN.HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project MPC-MPC04300